How to Update the Document Manager with a New Version of a Letter
-
Make sure the letter is on the G5 template.
-
Go to the Document Manager.
-
Find the old letter. Click its name to open it.
-
Remove the attachment. Then click OK to save it with no attachment.
-
Click the name of the letter to open it again.
-
Add the new letter as an attachment. Click OK to save it with the new letter attached.
Related Articles
G5 Letter has Track Changes Activated
Problem The letter will complete with errors when sent through the G5 printing process. Cause There were unaccepted track changes still marked up on the document. Note: This is not the only cause of the above problem, just one possible cause. ...
Document Manager Folders
Creating Document Manager Folders Creating folders in the Document Manager helps you to organize your documents. Go to the Document Manager. Click Add and select Folder. Type in the new folder’s name. Type in a description if desired. Optional: Place ...
How to Add a Document to the Document Manager
Go to the Document Manager. Click Add. Select Document. Select Document again. Type in a name for the new document. Click the Add button in the Attachment field. Browse to the folder that contains the document you want to add. Highlight the document ...
How to Add Campaign Letters to the Document Manager
Each campaign will draw all its letters from the same folder in the Document Manager. When you start a campaign, you will select the folder that campaign will have its letters in. G5 has default folders for each basic campaign type. Those folders are ...
How to Create a Letter using a Master Letter Template
While we do have a vast number of letters available, instead you may want to write your own letter for use within G5. You can do this using our master letter template following the instructions below. Pick the Right Template Download the appropriate ...